Associated Construction Publications


The Slide Rail System was an integral facet in the installation of the twin 900-foot-long, 84-inch-diameter water intake and outflow pipes.

For shear size and complexity, this was by far the biggest and most interesting trench shielding job I have ever been a part of, and I’ve been working with trench shield systems for over 25 years,” said Gary Carlson, president of Gary Carlson Equipment of Blaine, Minn., the PRO-TEC shielding and shoring distributor for the state of Minnesota.

Read the rest of this entry »